Vertical tracks must be level with each other for the door to function properly.
Garage door installation track level.
Often referred to as dual track it is best recognized by a second horizontal track.
Maintain 3 8 space between the door edge and the vertical track figure 7c.
If you have a regular door opener that is mounted above you door then the tracks should be level.
This second track is installed above the horizontal section that is attached to the curve from the vertical track section.
The bottom of the track must be equal to the bottom of the section.
Then they ll go horizontally parallel to the garage ceiling and floor.
If the garage door is secured in the tracks loosen the screws with the help of a screwdriver which will bind the tracks in the garage door frame.
Place the hinges.
The rail on the opener should be slightly higher in the front and about 2 3 inches above the door when the door is open.
Install the weatherstripping onto the bottom edge of the bottom door panel.
Attach the brackets for the cable to the bottom door panel following the manufacturer s instructions regarding the.
Adjusting the tracks for a binding garage door step one.
Using a rubber mallet tap the bottom of the track so it is perfectly.
The door runs are housed in a garage door track one on each side of the garage door.
The installation process varies by.
If not level raise the lower track but not higher than 3 8 from the floor figure 7d.
This very common garage door track option uses up even less headroom space than a 12 radius track.
Vertical tracks must be plumb as well.
Loosening the track screws.
Adjusting the track position.